SOLAR PARK 30 MW
EGA

EGA
Año de construcción
2021 - Ongoing
Tipo
PHOTOVOLTAIC
Potencia
30
EL PROYECTO
The photovoltaic installation "EGA", in Spain, is part of a series of projects developed by TCI for the UTE Aurinka International S.L. and Steag Solar Energy Solutions (Ibérica) S.L.U. The project is located in the municipality of Tabernas (Almería).
TCI started its activities in the project in 2021, being in charge of the execution of the electromechanical assembly and commissioning of the Photovoltaic Park until it reaches commercial operation, including the following:
- Electrical installation;
- Connection and laying of grounding wiring;
- Medium voltage, low voltage, fiber optic and communication cabling;
- Assembly-installation and connection of low voltage panels, weather stations, CCTV, unloading and transfer of material from the storage area to the place of use;
- Connection of Photovoltaic Panels;
- Start-up assistance.
The plant has an installed power of 30 MW and approximately 73,164 modules, occupying an area of about 65 Ha.
TCI started its activities in the project in 2021, being in charge of the execution of the electromechanical assembly and commissioning of the Photovoltaic Park until it reaches commercial operation, including the following:
- Electrical installation;
- Connection and laying of grounding wiring;
- Medium voltage, low voltage, fiber optic and communication cabling;
- Assembly-installation and connection of low voltage panels, weather stations, CCTV, unloading and transfer of material from the storage area to the place of use;
- Connection of Photovoltaic Panels;
- Start-up assistance.
The plant has an installed power of 30 MW and approximately 73,164 modules, occupying an area of about 65 Ha.