THE PROJECT
The "Finisterrae II" Photovoltaic Project in Chile is one of a series of projects developed by TCI for Sungrow Power Supply SpA. The project is located in the commune of Maria Elena in the Antofagasta Region about 1,300 kms north of Santiago de Chile, and corresponds to the extension of the original solar park that was built in 2015. TCI started its activities in the project in 2021 and was in charge of the assembly and interconnection of converter units, including the following:
- Unloading, storage, anchoring and installation of Convertion Units.
- Interconnection of the transformer station between the inverters.
- Installation of COM / AC cable between the Trafo and inverters.
- Installation of COM, AC, LV and MV cable fixing brackets.
- Installation of auxiliary services board.
- Installation of conduits.
- Connection of power cables between CT and inverters.
- Low voltage cable insulation tests.
- Installation of anti-rodent and smoke detection systems.
- Start-up assistance.
The plant has an installed power of 126 MW.
- Unloading, storage, anchoring and installation of Convertion Units.
- Interconnection of the transformer station between the inverters.
- Installation of COM / AC cable between the Trafo and inverters.
- Installation of COM, AC, LV and MV cable fixing brackets.
- Installation of auxiliary services board.
- Installation of conduits.
- Connection of power cables between CT and inverters.
- Low voltage cable insulation tests.
- Installation of anti-rodent and smoke detection systems.
- Start-up assistance.
The plant has an installed power of 126 MW.