SOLAR PARK 50 MW
TABERNAS II

TABERNAS II
Year of contruction
2021 - Ongoing
Type
PHOTOVOLTAIC
Power capacity
50MW
THE PROJECT
Photovoltaic installation "TABERNAS II", in Spain, is part of a series of projects developed by TCI for the UTE Aurinka International S.L. and Steag Solar Energy Solutions (Ibérica) S.L.U. The project is located in the municipalities of Tabernas and Turrillas (Almería).
TCI started its activities in the project in 2021, being in charge of the execution of the electromechanical assembly and commissioning of the Photovoltaic Park until it reaches commercial operation, including the following:
- Electrical installation;
- Connection and laying of grounding wiring;
- Medium voltage, low voltage, fiber optic and communication cabling;
- Assembly-installation and connection of low voltage panels, weather stations, CCTV, unloading and transfer of material from the storage area to the place of use;
- Connection of Photovoltaic Panels;
- Start-up assistance.
The plant has an installed capacity of 50 MW and approximately 151,500 modules.
TCI started its activities in the project in 2021, being in charge of the execution of the electromechanical assembly and commissioning of the Photovoltaic Park until it reaches commercial operation, including the following:
- Electrical installation;
- Connection and laying of grounding wiring;
- Medium voltage, low voltage, fiber optic and communication cabling;
- Assembly-installation and connection of low voltage panels, weather stations, CCTV, unloading and transfer of material from the storage area to the place of use;
- Connection of Photovoltaic Panels;
- Start-up assistance.
The plant has an installed capacity of 50 MW and approximately 151,500 modules.